4 items
P0 decision Third Division Labs 3dl-823
Close NuHarbor as lost deal — 18+ days overdue.
NuHarbor: Receive and review Jack's contract draft (scope definition)
Jack Danahy committed (2/20 call) to drafting a contract that outlines transition scope. No ETA given. Action: Follow up if no draft received within ~1 week (by 2/27). Once received, review with Counsel agent for terms. Parent context: 3dl-q8g (exploratory conversation — completed).
P0 action Third Division Labs 3dl-79f
Optimize LinkedIn for fractional CTO + expert network keywords.
Optimize LinkedIn for fractional CTO + expert network keywords
Before applying to platforms. Update headline, summary, and experience to emphasize: fractional CTO, VP Engineering, cybersecurity, AI, engineering leadership. This is the profile platforms vet against. Ref: docs/expert-network-research.md
P0 decision Aerocloak / Magnetic Shielding ms-nr93
Decide: prep workspace now or defer aerocloak physical build.
Prep workspace: clear table, tidy basement, rearrange office for prototyping workbench
P1 action Third Division Labs 3dl-99e
Map founder network + draft outreach templates.
Strategist: Map founder network + draft outreach templates
Two deliverables: (1) Network map — categorize founder's professional contacts into tiers. Tier 1: former direct reports/peers at NuHarbor, Barkly, Alert Logic (50-100+). Tier 2: NuHarbor client contacts, DemystData/IPsoft colleagues (50-100). Tier 3: extended network (100+). Prioritize people...